Snatch strength + back squat
- row 3 min easy (raise HR)
- banded ankle dorsiflexion 30s/side + foam-roll t-spine extension x8 + shoulder dislocates x10
- PVC snatch passthroughs x10 + overhead squat x8 (2 rounds, positions)
- empty bar: muscle snatch x3 + overhead squat x3 + snatch balance x3 (2 sets, groove the turnover + receive)
- then build to working weight on the snatch below
- row 3 min easy (raise HR)
- banded ankle dorsiflexion 30s/side + foam-roll t-spine extension x8 + shoulder dislocates x10
- PVC snatch passthroughs x10 + overhead squat x8 (2 rounds, positions)
- empty bar: muscle snatch x3 + overhead squat x3 + snatch balance x3 (2 sets, groove the turnover + receive)
- then build to working weight on the snatch below
